Published at 2015-10-31 18:53:08
Executives
Rafael Borja - Corporate Communications Roque Benavides - CEO Carlo Galvez - CFO
Analysts
Carlos De Alba - Morgan Stanley Karel Luketic - Bank of America John Bridges - JP Morgan Patrick Chidley - HSBC Tanya Jakusconek - Scotiabank
Operator
Good morning. My name is Katie, and I'll be your conference operator today. At this time, I would like to welcome everyone to the Buenaventura Conference Call. All lines have been placed on mute to prevent any background noise. After the presentation, we will conduct a question and answer session. The instructions on how to ask a question will be given at that time. Thank you for your attention. I would now like to turn the call over to Rafael Borja of i-advize Corporate Communications. Sir, you may begin.
Rafael Borja
Thank you, Katie, and good morning, everyone. Welcome to Compania de Minas Buenaventura's Third Quarter 2015 Earnings Conference Call Please be advised today's call is for investors and analysts only. Therefore, questions from the media will not be taken. Joining us from Lima, Peru are Mr. Roque Benavides, Chairman and Chief Executive Officer, Mr. Carlo Galvez, Chief Financial Officer, and members of the company's management team. [Indiscernible] the press release is issued yesterday, Thursday, October 29. If you did not receive a copy, please contact i-advize in New York at 212-406-3693. Before we begin, I would like to remind you that during this call comments made by the management may include forward looking statements which are subject to various conditions and uncertainties based on a variety of factors. These forward looking statements may differ materially from actual results. That we ask that you refer to the disclaimer located in the earnings release prior to making any definite decision. And now it is my pleasure to turn the call over to Mr. Roque Benavides, Chairman and Chief Executive Officer of Buenaventura for his presentation. Mr. Benavides, please go ahead.
Roque Benavides
Thank you, and welcome to Buenaventura's Third Quarter Conference Call. In this quarter, EBITDA from our direct operations was $6.9 million, and adjusted with the associated company was $73.5 million. Total activity for production in the third quarter was 187,000 gold ounces and 5.8 million ounces of silver. At the Tambomayo Project, 100 percent of major equipment has been purchased, and operations are expected to start in the third quarter 2016. At the San Gabriel Project, the environmental impact assessment of the project's construction is expected to be approved in the first quarter of next year. During the third quarter 2015, El Brocal average ore treated reached 15,000 tons per day level. Full production capacity level of 18,000 tons per day will be reached in the first quarter 2015. Cerro Verde's planned expansion to 360,000 tons per day is in line with schedule and budget. Full plant capacity is expected to be reached in the first quarter of next year. In terms of our operating revenues during this quarter, net sales were $200 million a 35 percent decrease compared to the $306 million reported in the same quarter of 2014. This was mainly explained by a decrease in gold, silver and copper prices as well as lower gold and copper volumes sold. Royalty income decreased 9 percent to $8.7 million in this quarter, compared to $9.5 million in the same quarter of 2014. This was due to lower revenues at Yanacocha, 13% lower quarter to quarter. In terms of our production and operating costs in the third quarter of 2015 Buenaventura's gold equities production from direct operations decreased 16 percent from 108,000 ounces in the third quarter of 2014 to 91,000 ounces in this quarter due to the decline in production at the Breapampa mine that was expected. Gold production, including associated companies was 187,000 ounces 9% lower than the reported in the same period 2014. Silver equity production from direct operations increased 11 percent mainly due to higher production at Uchucchacua. In Orcopampa, our gold production increased 3% in the third quarter 2015 compared to 2014 due to higher all-grade costs applicable to sales in the third quarter decreased 23% explained by lower contractual costs and lower reagent costs. Gold production guidance for 2015 continued to be between 190,000 and 205,000 ounces of gold. At Uchucchacua, silver production increased 15% compared to the third quarter of 2014 due to higher ore treated. Costs applicable to sales decreased 24% compared to third quarter 2014, mainly explained by lower consumerable costs and lower holding costs. Silver production guidance continued to be between 14 million and 14.5 million ounces of silver. At our Julcani mine, silver production increased 3% compared to third quarter 2014 due to higher ore treated despite the lower grade. Costs applicable to sales in the third quarter 2015 was 21% lower than the third quarter 2014 mainly due to lower exploration expenses. Our guidance continues to be in the order of 3 million ounces of silver. At La Chancas, gold production in the third quarter 2015 decreased 1% compared to the same period of 2014. Costs applicable to sales in the third quarter of this year increased 22% mainly due to higher ore hauling costs explained by the longer distance between the Pampa Verde Pit and the leaching pad compared to the San Pedro Sur Pit. In the same quarter 2015, 95% of the production came from the Pampa Verde Pit in contrast to 50% in the same quarter of 2014. Gold production guidance for this year continues to be between 138,000 and 142,000 ounces of gold. At Tantahuatay, gold production in the third quarter decreased 7% compared to the same figure of last year. Costs applicable to sales increased 14%, mainly due to higher stripping ratio and preoperational stripping in the Cienaga Norte pit. Gold production guidance continues to be 138,000 to 142,000 ounces of gold this year. At El Brocal, during this quarter, 55% of the plant capacity was used to treat pollymetalic ores and 45% to treat copper ores. As a consequence, Copper production decreased 20%, silver production increased 26% and Zinc production increased 667%. In this quarter, Zinc cost applicable to sale increased 30% compared to the same quarter last year, mainly due to higher commercial deductions. Copper cost applicable to sales decreased 2% compared from third quarter to the same quarter of 2014. Zinc production guidance for this year continues to be between 50,000 and 55,000 metric tons and copper production guidance between 30,000 and 35,000 metric tons. General and administrative expenses were $20.4 million, 11% lower compared to the third quarter of 2014. For the nine months period 2015, the expense was $60.8 million. Exploration in non-operating areas during this quarter $5.3 million, compared to $7.2 million in the same quarter last year. During the period when Buenaventura main exploration efforts were focused on Tambomayo project and for the nine months period 2015, the expense was $25.7 million. During the third quarter, Buenaventura share in associated companies was $13.4 million compared to $23.6 million reported last year. At the Yanacocha during this quarter, gold production was 242,000 ounces of gold, 3% lower than the same period of 2014. For the nine-month 2015 period, our gold production was 706,000 ounces of gold, 9% higher than the same period of 2014. Gold production guidance at the Yanacocha is between 880,000 and 920,000 ounces of gold. At Cerro Verde during this quarter, production was 55,800 metric tons, a 5% increase compared to the same quarter 2014, 10,430 metric tons attributable to Buenaventura. For the nine months of 2015, copper production was 151,000 metric tons. During this quarter, Cerro Verde reported a net profit of $6.7 million compared to $85.3 million in the same quarter of 2014. This was mainly due to lower sales explained by the decline in copper price despite of 12% increase in volumes sold. For the nine months of 2015, net income was $46.5 million compared to $321 million in the same period of 2014. Capital expenditures at Cerro Verde were $385 million compared to $1.3 billion in the same period of -- no, $385 million in the same quarter and $1.3 billion for the first nine months of this year. Cerro Verde's plant expansion was 360,000 metric tons, in line with schedule and budget. In September 2015, one of the primary crushers and two mills started operations, resulting in the first production of copper concentrate coming from the new plant. As of September 30, 2015, accumulated CapEx on the expansion project was $4.5 billion. Full plant capacity is expected to be reached in the first quarter of 2015 and will become the largest concentration plant facility in the world. At Coimolache, attributable contribution to the net income in the third quarter was $4.1 million. For the nine months of this year, the contribution was $10.1 million compared to $17.2 million in the same period of 2014. In terms of our project development, the Tambomayo project, 100% owned by Buenaventura. Detailed engineering currently at 95% of development. Civil works are expected to be completed by the third quarter next year, 100% of major equipment has been purchased and CapEx of $290 million to $340 million, including 100% of mine development in a plant of 1,500 metric tons per day. At San Gabriel, environmental assessment is expected to be approved in the first quarter of 2016 feasibility plan is complete in the third quarter next year. Estimated CapEx at this point in time, $400 million to $500 million. Basic engineering of the project is expected to be ready by the first quarter of 2016, and construction of the expiration ramp 280 meters distance have been concluded. In the last -- yesterday, we had our board meeting, and we have approved a financing transaction for El Brocal especially, El Brocal has called for an increase in capital of $70 million in two tranches of $35 million each. And in an initial stage, there will be issuing a private bond issue of $35 million that adds to altogether to $70 million, which the first set will be an increasing capital and to year end both issue that will be converted into capital in due time. With this we are open to any questions that you may have from Carlos Galvez, Igor Gonzalez. And we have Gonzalez Ayerre, the General Manager of Brocal, also with us this morning. Thank you.
Operator
Thank you, sir. At this time, we will open the floor for questions. [Operator Instructions]. Our first question comes from Carlos De Alba from Morgan Stanley.
Carlos De Alba
Yes. Good morning, gentlemen. Thank you very much. So the first question is if you could help us understand the big difference that we saw between silver production of around 5.6 million ounces in the quarter and silver volumes vault of around 4.86 million ounces. And then the second question is if you can quantify, you know, how much the higher stripping ratio and particularly the pre-operational stripping of the Cienaga Norte peat in Tantahuatay. What was the impact that that had on cash? And if that will continue in the next few quarters. That's basically, that's the questions that I have right now.
Carlo Galvez
Well, Carlos, it's Carlos Galvez. The difference the 1 million ounces that you mentioned between the silver production and silver contained salt is mainly due to a slight increase in different operations of the inventory. In the case of Uchucchacua, we increased our inventory by 700,000 [ph] ounces. In the case of Julcani, we increased 200,000 this is because the material salt in the case of Julcani is considered one this material which is through the smelter which is about the time that has taken to this content is just material in inventory. And in short increase in Brocal inventory used through the burning production of - the additional production of ore concentrate coming from the [indiscernible] that increased something else to 50,000 ounces. Generally in general terms, we have explains about 750,000 ounces. We have additional materials that come as a byproduct in other different operations, like the Tantahuatay, the [indiscernible] and others. In terms of the stripping ratio in Tantahuatay, it has to increase from about 0.07 to 0.26 even that the numbers. So this increase in the stripping ratio will remain for throughout this year and then the first quarter of next year.
Carlos De Alba
Okay. Thank you. And just another one, if I may ask, looking at Appendix 5, the all are in sustaining cost. If I looked at the Buenaventura column and also the attributable production columns, they are the numbers for all-in sustaining costs are close to $1,200 per ounce. So basically it means that, at these levels, the company is just breaking even in gold operations. So what -- could you comment how do you see this situation and what are the plans that the company has to have issue that the cash generation on an all-in basis improves going forward.
Carlo Galvez
Well, essentially in a very profound effort to reduce costs, and we are getting some important results. The fact that Orcopampa has reduced its costs, the fact that, that may be because of lower grades, La Chancas and Tantahuatay may have increased somewhat. But we expect that in this quarter, in the fourth quarter, costs in the La Chancas and Tantahuatay will also come down. So the thing that we -- we are confident that costs in all of our operations will come down and certainly will contribute to the overall profit of the company.
Roque Benavides
Just to add a little bit more flavor on this, what we have done in terms of costs in the operation is that we map the older elements that contribute to the costs. And then we've targeted the largest elements -- the largest contributors to cost, such as contractor charges and supplies, for example. And we are renegotiating some of our -- with our some of our suppliers. And we are also working on productivity programs in every mine. So every mine has a program to improve productivity. If you review the cost data for this quarter in all the underground mines that has been the trend. So we expect that this will continue going forward.
Operator
Thank you. Next question comes from [indiscernible] from Credit Suisse.
Unidentified Analyst
And could you elaborate a bit more on how will Uchucchacua vertical expansion impact overall cost? And also a second question. If you could provide guidance on Cerro Verde's production for the remaining of 2015 and for 2016 and also how will the expansion impact cash costs? Thank you.
Roque Benavides
Well, in the case of the Uchucchacua -- well, it's not actually an expansion. We are just to complete each month some additional opportunities to meet -- to increase the [indiscernible] per month -- much of the 100 tonnes through 2018, 100 tonnes [indiscernible]. But this what it means to dilute sort of fixed costs and, on the other hand, we are going to improve the methodological postures in order for instance to reduce the sanitation [ph] of certain material that will permit us to reduce the un-sustaining costs due to the expansion of special [indiscernible] facilities. On the case of EL Brocal, for sure. Achieving the target of for the region 18,000 tons in three months will permit to reach these lower cash costs for our operations. Gonzales that he is over here could expand on that, because he has full details. I don't know if Gonzales, you can...
Carlo Galvez
Yes. We are working on reducing costs. That's a major issue for us. And we seek to have a reduction of at least 5% to 7% of our total costs. So how we are going to do that? We are renegotiating with our contractors. We are also reducing the costs of regions, of -- in quantity and in prices. And we are also working on having better recovery by including some additional modifications to our project. And we are also working on improving our production by including two cone crushers. These cone crushers are going to be installed in parallel to the one that we have right now. And that project will be ready by January. With that project, what we expect is to increase the production and the recovery by decreasing the [indiscernible] size.
Roque Benavides
Regarding the Cerro Verde's performance and production with -- well, they are progressing well with the first step. They have already reached initially up to 100,000 tons per day to put from the new facility. And they are going to progress its worth to mention. In this regard, they have [indiscernible] they have added certain additional production that has needed [ph] to reduce the cash cost during September, for instance, at a level of $1.47, which was lower than what it has been during the past. So, $1.49, sorry per pound. And in terms of focus, we expect to achieve these lower continue [indiscernible] and within lower cash costs in the future to the extent that we reach the total capacity. Importantly, we mention that the reduction in the contribution expected on the profits from Cerro Verdes is due to the fact that they began to depreciate the new facility in September and due to this depreciation during one month September was close to $18 million, as compared with a traditional $11 million they got. So this is something that we expect has a positive result.
Unidentified Analyst
Do you expect that production as of the end of the year?
Roque Benavides
Well, it is difficult to mention because these [indiscernible] ramp up --.
Carlo Galvez
The accumulated production is -- I would like to comment on the - for example, on the material mines, they are on target right around about 700,000 tons per day. On the accumulated production, they are also on target -- the final figure for the year should be around between 450,000 and 550,000 tons. So they are on target again there and also on the [indiscernible].
Roque Benavides
Yes. Well, the thing is the projection should be in the order of 280,000 tons of copper, that's the budget.
Operator
Thank you. Your next question comes from Karel Luketic from Bank of America.
Karel Luketic
Hi. Good morning, Roque and everyone. Thank you for the questions. I have two questions. The first one is a follow-up of the question you were just answering. Just to confirm, this year we're talking about 280,000 tons potentially from Cerro Verdes. And looking at 2016, if I'm not mistaken I heard 450 to 550, right?
Roque Benavides
No, no. It's in the order of 600,000 tons of copper. That was this year's projection. Sorry, sorry let's clarify it. 280,000 tons of copper will be produced this year. Next year will be duplicating - or in excess of duplicating the production. We expect to reach 600,000 tons of copper next year. That's the figure.
Karel Luketic
That's clear. Perfect. And my second question, actually, its two questions tied to the same one. Looking at the Yanacocha here, what is the outlook in terms of -- I know you still haven't provided official guidance for next year. But what can we expect in terms of [indiscernible] volumes are a bit more broadened, and the same looking at cost? And my second question, maybe tied to Yanacocha or not, is there any sort of M&A that you are considering today? Not only in the Yanacocha, renegotiating your stake or something of this sort or even outside of the Yanacocha, is there any other option that we're analyzing? Those are my questions. Thank you.
Roque Benavides
Well, the Yanacocha will produce similar to this year for next year. But it will depend on the expirations. We don't have a specific figure at this point in time. In terms of M&A, we essentially have nothing to comment on that respect. We don't have any specific information to give at this point in time.
Operator
Thank you. Your next question comes from John Bridges of JP Morgan.
John Bridges
Good morning, Roque, Carlos, Igor. Congratulations on the cost control progress that [indiscernible]. I was just wondering. You mentioned the higher DD&A at Cerro Verdes. And there's an accumulated spend of $4 billion, I understand was covered by project debt, I'm just wondering if that was being capitalized up until now and maybe the interest charge on that is going to start showing up in the accounts next year. I just wondered if you had any idea on, what we should keep in -- take into account over and above the $1.50 per pound for a cash cost in order to get to the likely contribution to your numbers beginning next year. Thank you.
Roque Benavides
The thing is that what Cerro Verdes has is a $1.8 billion facility, which has been taken and has been invested. I don't know would you specify your question, please? I don't know if I got it.
John Bridges
I was just wondering, will there be an interest charge which was perhaps, capitalized up until now which will show up in their income statement?
Roque Benavides
No. They have been considering the financial expenses, the P&L, they have capitalized only during the construction. But from now on, they are going to spend what is going to [indiscernible] to deter quarterly in terms of financial costs.
John Bridges
So was that included in the Q3 results with the higher DD&A or [indiscernible] in Q4?
Roque Benavides
No. They are going to begin in the fourth quarter. They began only to charge depreciation and amortization due to the way to declare and to calculate assets per units produced. So when they began to use the new facilities, they began to depreciate that.
John Bridges
Do you happen to know what the interest rate is on that? Maybe we can discuss afterwards?
Carlo Galvez
No. The interest rate is reliable to us, 1.9 percent.
Operator
Thank you. Our next question comes from Patrick Chidley from HSBC.
Patrick Chidley
Just well done on the cost control on some of the assets there and I think it's great that you've been able to renegotiate some of those contractors down, and I think it's showed in some of the mines there. But one where obviously it doesn't seem to be the case is Brocal. And I was just wondering is there any way you can get these commercial deductions down? They seem to be extremely high and a big portion of actual revenue? Thanks.
Roque Benavides
Well, you can make that the commercial deductions in the case of copper have to do with the arsenic [ph] content of the concentrate. But the effort that Gonzales Ayerre and his team is doing in Brocal is essentially concentrated in renegotiating with contractors, and as he mentioned, reducing the consumption of some [indiscernible]. And they are doing an effort. In the middle of around [indiscernible] that have been quite difficult but that we are getting there. And we have confidence that we will improve the results of Brocal going forward.
Carlo Galvez
Sorry. But perhaps something that is really important to clarify. When we mentioned the average realized copper price of Brocal, what we are talking -- what we are talking is not necessarily regarding to the drilling charges that Roque mentioned but specifically is the impact of the final price we obtained and we charge to the current price due to the QP ph. In the case of our sales in Brocal, that is the QP has a difference of six months in some deliveries and up to eight months in some certain deliveries. And this negative impact due to the drop of prices impacted the current price. So this is something that shouldn't be repeated towards the future. But if we keep flat, we are going to continue reporting the provision of prices.
Patrick Chidley
Yes, $3,700 a ton. That was actually provisional pricing impact. And that's not to be continued. So you will get more revenue per ton for your copper, you think, if it's a fairly flat pricing environment.
Roque Benavides
[Indiscernible]
Operator
[Operator Instructions] Our next question comes from Tanya Jakusconek from Scotiabank.
Tanya Jakusconek
I have two questions, and one's a technical one and one's just on the finances. Maybe on the technical one, just on Tambomayo. I think on the last conference call, we talked about the CapEx and the $250 million range. And now it's 290 to 340. Maybe someone can explain to me, like, what has happened to have that increase in the CapEx?
Roque Benavides
What happened is that the CapEx mentioned over here is a 100% CapEx, the total CapEx of the project. What we have [indiscernible] is to round at 125. We have already progressed, and -- but the figure is not the number that we have to disburse. We have already disbursed in excess of 50% of that.
Carlo Galvez
Tanya, the CapEx includes mine development also. So we have completed about 98% of the detailed engineering for the project. And we have, as Roque mentioned, purchased 100% of major equipments. And what we are doing -- we are finalizing now all the bulk [indiscernible] and beginning the concrete -- some of the foundations for the equipment as we speak. And we are also mobilizing some of the structural steel. So the project is moving along quite well and -- but, yes. Our capital figure includes the mine development cost.
Tanya Jakusconek
So the number given of 250 million last quarter did not include the mine development cost?
Roque Benavides
Yes. It did.
Tanya Jakusconek
I'm just trying to reconcile the 250 million that was given to us last quarter and the 290 to 340 is one without mine development and this one now is with?
Roque Benavides
No, no. The question is that when we mentioned this with development cost and the building of the project. But this cost of between 290 to 300, so it includes the full exploration, the full cost of the budget since the beginning. There has been 350 is without considering the time cost of this project.
Tanya Jakusconek
So the 250 million you gave us last quarter was -- is less to be spent?
Carlo Galvez
Last we have the development and construction that we had to sign up for exploring and putting this project in... [Multiple speakers].
Carlo Galvez
But we have already invested in the project close to $100 million, so what is left to invest is more in the order of $150 million to $160 million.
Tanya Jakusconek
Okay, all right. And then maybe if you can just -- I wanted to ask about the grant the loan of $21 million that was done, what exactly was that?
Carlo Galvez
Which loans, please?
Tanya Jakusconek
That you granted a loan of $21 million, was in your press release.
Carlo Galvez
Well, the loan that we have granted to Cerro Verdes that the main shareholders of Cerro Verdes committed to grant some loans in subordinated loans, if there were certain limits on the covenants of these financial facilities. Cerro Verdes has already received 1.6 billion out of the 1.8 billion committed and its [indiscernible] to continue receiving additional $200 million to complete the project. However, temporarily due to the EBITDA generated, there was a constraint in the relationship that EBITDA generated and due to lease and not to break these covenants, we were requested we will cost our deeps as [indiscernible].
Operator
Thank you. [Operator instructions]. I am showing no further questions. I would now like to turn the call over to Mr. Benavides for closing remarks.
Roque Benavides
Well, thank you again for attending this conference call. This has been a quarter where we have shown essentially cost reductions, the effort that the organization has been doing in targeting these reductions in cost. We certainly have been working very hard on El Brocal and we do expect results from now on. In Cerro Verdes production with lower copper pricing was impacted relatively, but the expansion is under way. And we are very pleased to say that it's on budget and on time and it will certainly contribute to the overall revenues of Bonaventura. With that, I thank you for attending this conference and hope to see you soon. Thank you, and good morning.
Operator
Thank you, ladies and gentlemen. This concludes today's conference. You may now disconnect.