Dominion Energy, Inc.

Dominion Energy, Inc.

$58.51
0.25 (0.43%)
London Stock Exchange
USD, US
General Utilities

Dominion Energy, Inc. (0IC9.L) Q3 2021 Earnings Call Transcript

Published at 2021-11-05 13:42:08
Operator
Welcome to Dominion Energy Third Quarter 2021 earnings conference call. At this time, each of your lines is in a listen-only mode. At the conclusion of today's presentation we will open the floor for questions. Instructions will be given for the procedure to follow if you would like to ask a question. I would now turn the call over to David McFarlane, Director Investor Relations.
David Mcfarlane
Good morning, everyone. And thank you for joining the call. Earnings materials, including today's prepared remarks, may contain forward-looking statements and estimates that are subject to various risks and uncertainties. Please refer to our SEC filings, including our most recent annual reports on Form 10-K, and our quarter reports on Form 10-Q for a discussion of factors that may cause results to differ from management's estimates and expectations. This morning, we will discuss some measures of our Company's performance that differ from those recognized by GAAP. Reconciliation of our non-GAAP measures to the most directly comparable GAAP financial measures which, we can calculate, are contained in the Earnings Release Kit. I encourage you to visit our Investor Relations website to review webcast slides as well as the Earnings Release Kit. Joining today's call are Bob Blue, Chair, President, and Chief Executive Officer. Jim Chapman, Executive Vice President, Chief Financial Officer and Treasurer, and other members of the executive management team. I will now turn the call over to Jim.
Jim Chapman
Thank you, David. Good morning, everybody. Let me begin with a recap of our compelling investment proposition and highlight our focus on the consistent execution of our strategy. We expect to grow our earnings per share by 6.5% per year through at least 2025. Growth that is driven by our $32 billion 5-year growth capital plan.
David Mcfarlane
As outlined in our fourth-quarter call in February, over 80% of that capital investment is emissions reduction enabling. And over 70% is rider recovery eligible. We offer a dividend yield of 3.5% and expect -- decarbonization investment opportunity in the nation, which as you'll hear today -- as you will hear in today's prepared remarks, is steadily transforming from opportunity to reality. There's quite a few exciting developments related to that transformation to discuss this morning, including the pending settlement of our triennial review and our offshore wind application in Virginia, in addition to other positive updates across our operating segments. Before handing it to Bob for those and other business updates, I'll discuss our Third Quarter results and related financial topics. First, our strong quarterly earnings. Our Third Quarter 2021 operating earnings as shown on Slide 4 were $1.11 per share which were this quarter. These strong results were slightly above the top end of our quarterly guidance range. Positive factors, as compared to last year, include growth from regulated investment across electric and gas utility programs, higher electric sales due to increased usage from commercial and industrial segments, and the impact of the share repurchase completed late last year, and a return to normal weather. This is our 23rd consecutive quarter, so almost 6 years now of delivering weather normal, quarterly results that meet or exceed the midpoint of our quarterly guidance ranges. Note that our third quarter and year-to-date GAAP and operating earnings together with comparative periods, are adjusted to account for discontinued operations, including those associated with the sale of our gas transmission and storage assets. Third quarter GAAP earnings were $0.79 per share and reflect a non-cash mark-to-market impact of economic hedging activities. Unrealized changes in the value of our nuclear decommissioning trust fund. The contribution from Questar pipeline, which we will continue to be accounted for as this continued operations until divested a year-end and other adjustments. A summary of all adjustments between operating and reporting results is as usual, included in scheduled 2 of Earnings Release Kit. Turning now to guidance on slide 5. As usual, we provide d a quarterly guidance range, which is designed primarily to account for variations from normal weather. For the Fourth Quarter of 2021, we expect operating earnings to be between $0.85 and $0.95 per share. Positive drivers, as compared to last year, are expected to be normal course regulated rider growth, continued modest strengthening of sales from commercial and industrial segment, and slight margin help within contracted assets. Negative drivers, as compared to last year, are expected to be a slight catch-up in COVID deferred O&M and tax timing. Given where we are in the year, we're narrowing our 2021 full-year guidance range to $3.80 to $3.90 per share, preserving the same midpoint as our original guidance. Assuming normal weather for the remainder of the year, we expect operating earnings per share for 2021 to be in the upper half of its narrowed guidance range. We're also affirming long-term operating earnings and dividend growth guidance, no changes here from prior communications. We will, as usual, provide 2022 guidance on our fourth quarter call early in the New Year. But we continue to expect the midpoint of our 2022 guidance range to be 6.5% higher than the midpoint of our '21 guidance range. We continue to be very focused on extending our track record of achieving weather-normal results at or above the midpoint of our guidance on both a quarterly and annual basis. On Slide 6, we've summarized several important financial milestones achieved since our last call. First, we issued $1 billion and 10-year green bonds at our parent Company at a cost of 2.25%. This follows right on the heels of the $6.9 billion in sustainability linked to credit facilities which we announced on last quarter's call. So a lot of activity in Dominion on these types of innovative financings that support our ESG objectives. Thanks to all who participated in this important offering. And as a reminder, we'll have additional fixed income issuance at Dominion Energy, Virginia, Dominion Energy, South Carolina, and in our parent Company during the remainder of this year. In October, we announced the sale of Questar Pipelines to Southwest Gas Holdings. This all-cash transaction was valued at nearly $2 billion, including the assumption of about $430 million of existing debt. Proceeds from the sale will be used primarily to reduce parent level debt. We very much expect to close by the end of this year, subject only to HSR approval. Obviously, it's quite a bit of press attention currently on some of the dynamics unfolding around various shareholders of Southwest Gas, but I would highlight that there is no early termination mechanism in our purchase and sale agreement. As a reminder, this transaction does not impact Dominion Energy's existing financial guidance this quarter or otherwise. Just our pipelines has been and will continue to be accounted for as discontinued operations excluded from our companies calculation of operating earnings. Next as a result of our continued focus on both our capital allocation process and on our corporate credit profile, we've elected to monetize additional value from our investment in Cove Point by financing our stake with an attractive, non-recourse term loan. We've received binding commitments on $2.5 billion non-recourse term loan, which is at the entity that holds our 50% non-controlling equity method investment in The Cove Point facility. Proceeds from this EPS neutral financing are being used to reduce parent level debt. Over the past few years, we've been -- we've taken intentional and significant steps to effectuate fundamental change to lower our business risks, to maximize the recycling of capital into our attractive regulated utility businesses, and to improve our credit metrics. And this financing is another step along that same path. We expect this non-recourse recapitalization to be completed by year-end. Bigger picture, this financing provides a good opportunity to take a quick look back on the capital flows from that asset, Cove Point. As you will recall, we invested approximately $4 billion in the construction of the Cove Point Liquefaction project. And through the combination of prior stake sales and the project financing we're announcing today, we will have monetized well over $6 billion of capital to date, even before accounting for any distribution. Turning now to electric sales trends, weather-normalized sales increased 2.4% year-over-year in the Third Quarter in Virginia, and 1% in South Carolina. In both states consistent with the trends seen last quarter, we've observed increasing usage from commercial and industrial segments overcoming declines among residential users as the stay at home impact of COVID wanes. Looking ahead, we continue to expect electric sales growth in our Virginia and South Carolina service territories to continue at a run rate of 1% to 1.5% per year. Similar to what we were observing pre -pandemic to no changes there from prior communication. Next, let me discuss what we're seeing around rising natural gas prices and we're hearing a lot about this topic across the industry this quarter. We prioritize our customer rate affordability, and implement price mitigation strategies across our businesses in a variety of ways to account for the impact of changes in gas prices. So, across our electric and gas utilities, we have very clear cut pass-through mechanisms for fuel costs. So, this is less of an issue as to how the recent price increases may impact earnings, if they are sustained, but rather how they'll impact our customer's bills, something we obviously care about and we watch very closely. So let me share a little bit of color on what measures we have in place to mitigate those kinds of impacts. In our gas distribution service territories, we expect the bill impact of rising fuel prices to be less pronounced than what some recent headlines suggest due to few things, the proximity of gas resources, our widespread use of storage to offset peak-day requirements, and the effectiveness of our gas supply hedging strategies. In our Western states, our unique state regulated cost of service gas production also helps customers avoid price spikes. In fact, we estimate that our customers save over $100 million over just a seven-day period during the winter storms experienced last
Jim Chapman
February. Thanks to this regulatory structure. In our electric service territories, we also have longstanding risk mitigation strategies including hedging and storage with most fuel costs trued up to customer bills on a delayed basis a structure which helped to smooth out the bill impact of commodity swings. In summary, we certainly don't want to see any increased costs for any of our electric and gas customers. So we will continue to employ these mitigation measures to keep any increases as muted as possible, for the avoidance of doubt, we currently don't see any impact on our -- to our decarbonization focused growth capital investment plan. And wrapping up, we plan to use our Fourth Quarter call early next year to provide a comprehensive update and roll-forward of capital investment, financial outlook, and related disclosures akin to the format of our last Fourth Quarter earnings call which we believe was well received. Investors should expect further evidence in support of several fundamental Dominion Energy themes compelling an earnings and dividend growth, combined with the largest regulated de - carbonization opportunity in the industry, and unyielding focus on extending our track record of successful project, regulatory, and financial performance. With that, I'll turn the call over to Bob.
Bob Blue
Thanks, Jim. I'll start as usual by commenting on our safety performance. As shown on Slide 7, I'm very pleased that our results over the first 3 quarters of this year are tracking closely to the record-setting OSHA rate that we achieved in 2020. As it relates to our electric utilities, I would note that through the first 3 quarters of this year, we're in the top quartile of performance for the South Eastern electric exchange in combined incident rates. In fact, we're number 1. Now I'll turn to updates around the execution of our growth plan as shown on Slide 8. At gas distribution, in North Carolina, we reached a comprehensive settlement with the public staff last month for our gas operations, with rates based on a 9.6% ROE to be effective this month, and generally in line with our financial plan expectations. The agreement also includes 3 new clean energy programs. A new hydrogen blending pilot which, like our existing blending pilot in Utah, is part of our goal to be ready to blend hydrogen across our entire gas utility footprint by 2030, a new option to allow our customers to purchase R and G attributes and a new and expanded energy efficiency programs. The settlement is pending commission approval. In Utah, we received approval for a program that would enable customers to purchase voluntary carbon offsets. For $5 per month on a typical residential bill, customers who opt into the program will fully offset the carbon impact of their gas distribution use. This program, which like our existing green term program, allows customers to make choices about how to manage and lower their individual carbon profiles. Just one example of our gas distribution service intersects with an increasingly sustainable energy future. In South Carolina new rates were effective beginning September 1st, after the South Carolina Public Service Commission, with the support of all parties, unanimously approved the proposed comprehensive settlement in a General Electric rate case. It's also worth noting that in September, we filed an interim update to our modified 2020 IRP and resource Plan 8, remains the preferred plan, calling for the retirement of all coal fire generation in our South Carolina system by the end of the decade. Turning out of Virginia. Last month we announced a comprehensive rate settlement agreement in our pending triennial rate case in conjunction with the State Corporation Commission staff, the Office of Attorney General, and other intervener parties. We appreciate the balanced, reasonable, and cost-effective approach among the parties, which allowed an agreement which supports continued capital investments in Virginia in order to meet the Commonwealth's Clean Energy priorities and the needs of customers. Those investments include the development of offshore wind, which I will touch on in a few minutes, as well as growing one of the leading state regulated utility solar and battery portfolios in the country. The settlement also provides significant customer benefits as shown on Slide 9, and supports our existing financial earnings guidance. We're very pleased to be extending the track record of constructive regulatory outcomes to the benefit of all stakeholders. We look forward to a final order likely around the end of the year. We'll now move to our Clean Energy filings in Virginia as shown on Slide 10. In September, we made our largest to-date multi-project clean energy riding approved rider approval submission. The filing included about thousand megawatts of solar and battery storage and we expect to receive an order from the SEC in the second quarter of 2022. In October, we filed for rider cost recovery for the capital investment associated with extending the lives of our 2 nuclear units at the Surrey Power Station, and our 2 nuclear units at the North Anna power station, each for an additional 20 years. These units will be upgraded to continue providing significant environmental and economic benefits for many years to come. We expect to receive a final order by mid-2022. Lastly, we've made progress on our grid transformation plans. We participated in hearings with the commission, and based on our filings and testimony, the SEC staff supports or does not oppose approval for nearly all of our capital requests. We expect a final order late this year. Turning to offshore wind where we have an exciting announcement. Today, we're filing our offshore wind application with the SEC, consistent with the project schedule that we communicated previously. Key project milestones are shown on Slide 11. The filing will outline the important details of our process and costs, including contract per selection in terms, project components, transmission routing, capacity factors and permitting. Due to the importance of today's filing milestone, and especially given the sizable volume of information which will be included in this filing, I'm going to spend a little more time than normal this morning summarizing the important aspects. Some background. First, this project represents a viable and needed opportunity for Virginia to achieve its clean energy goals. Once complete in late 2026, this project will generate enough clean energy to power up to 660,000 customer homes and avoid as much as 5 million metric tons of carbon dioxide emissions annually, which is the carbon equivalent of removing more than a million cars off the road each year. Further, the project is essential to meeting the policy goals set forth in the VCEA and other legislation mandating the development and deployment of renewable generation resources. Lastly, as was contemplated in the BCEA, this investment will be 100% regulated and eligible for rider recovery. As a reminder, capital invested on the riders allow for more timely recovery of prudently incurred investments in costs. They are filed and trued-up annually in single issue proceedings. In Virginia, rider recovery mechanisms use a forward-looking test period and allow for construction work in progress, all of which minimizes traditional regulatory lag. As outlined on Slide 12, we estimate this project will create hundreds of jobs, hundreds of millions of dollars of economic output, and millions of dollars of tax revenue for the state and localities, as well as supporting Virginia in becoming a major hub for the versioning offshore wind industry in North America. For example, last week, Siemens Gamesa announce plans to establish the first offshore wind turbine blade factory in the U.S. The facility located in Hampton Roads, Virginia, will create new jobs and supply turbine blades to offshore wind projects in Virginia and throughout the North American offshore wind industry. Our filing details that we've satisfied the requirements for offshore wind, but let me touch on 3 key tests required for rider cost recovery. First, we've complied with the competitive procurement and solicitation standards for the project. Second, our projected levelized cost of energy or LCOE, of $87 per megawatt hour is substantially lower than the $125 per megawatt hour maximum established by the VCEA. More on that theme in a moment. And third, the VCEA requires that the projects construction commences prior to 2024 for U.S. income tax purposes, or the plan to enter service prior to 2028. Our project schedule satisfies both milestones. The long-term costs to our customers of this project which we believe is the most important metric for a regulated project of this nature, is $87 per megawatt hour, and remains within previously guided levelized cost of energy range of $80 to $90 per megawatt hour. Potential savings realized through future tax legislation could also be passed on to customers. For example, it's still early, but we estimate that further expansion to tax credits benefiting offshore wind would reduce the cost to our customers to $80 per megawatt hour. As we've developed the project to its current stage, we gained critical insights from 2 primary sources. First, our 12-megawatt pilot project which consists of the only operating turbines in federal waters has provided considerable benefit to the development and planning of the full-scale development. For example, the pilot project is providing better information about the wind resources off the coast of Virginia. Initially, we assumed a lifetime capacity factor of 41.5% for the full-scale deployment. After further evaluation of turbine design and wind resources, in addition to the real-time data we've gathered from our test turbines, we've determined that our original assumption was too low. We've revised the lifetime capacity factor to be 43.3%. This is beneficial both for the project as well as our customers because higher-generation will result in a lower LCOE. Secondly, we've contracted with firms that have significant experience in offshore wind farm design, construction, and operations to support the project. When we announced the project in September of 2019, the initial pre -engineering and pre - RFP estimated cost was approximately $8 billion. Since that time through the process of detailed engineering, and most importantly through competitive solicitations for all components and services, we've now developed a detailed budget of approximately $10 billion. As I've been discussing across several quarterly calls now, the cost increase can be attributed to, among other things, commodity and general cost pressures as seems to be the case across a number of industries right now. And the completion of the conceptual design phase for the onshore transmission route, which has gone through extensive stakeholder engagement with consideration given for resiliency and connection into our existing 500 kV system, as well as to minimize impacts on surrounding communities, including environmental justice communities, private lands, environment scenic, and historic resources. A summary of the major components of the competitive bidding process are outlined on Slide 14. These 5 major agreements collectively represent about $6.9 billion. The remaining project costs include $1.4 billion for onshore transmission, substation facilities, and currently projected system upgrades as well as approximately $1.5 billion for other project costs including contingency. The onshore transmission facilities are necessary to interconnect to offshore generation components reliably, and to maintain the structural integrity and reliability of the transmission system in compliance with mandatory NERC standards. As we observed within the industry recently, utility systems are only as good as they are resilient. Our decision to connect this project to the 500 KV transmission system meets these goals and provides the best mechanism to ensure that the project's power will be disbursed and used by customers throughout our service territory. We believe the decisions we're making around onshore engineering configurations will result in the best value for customers. As relates to our [Indiscernible] compliant wind turbine installation vessel, construction remains on track with delivery expected in late 2023, and we continue to expect it to be an invaluable resource to the growing U.S offshore wind industry. Turning to Slide 15, let me discuss how our project cost compares to the other U.S off-shore wind projects. A few observations. First, most of these unregulated or merchant projects remain in the permitting and approval process. For our projects, I would note that it's the only state regulated offshore wind project, we've made considerable progress on development to date, and remain on track to complete construction in late 2026. Next, these offshore wind projects located up and down the East Coast obviously differ significantly in their timing or vintage size and scope. For example, the announced capital costs and expected LCOEs for some projects, include the cost for necessary onshore transmission upgrades and interconnections as our budget does. But some do not. And some headlines focus on the year-1 PPA pricing for many of these unregulated or merchant projects without reflecting the full cost and incorporating such factors as it's pricing, escalation, which we incorporate. Regardless, we show here a comparison based on publicly available information, including all such factors of the levelized cost of energy of those merchant projects to our own regulated project. Turning to slide 16, let me address customer rates in Virginia, inclusive of our offshore wind project. First, a reminder that between 2008 and 2020, our typical residential customer rate increased on average by less than 1% per year, which is much lower than the average annual inflation over that period of closer to 2%. Second, based on EIA data, our typical customer rate is 17% lower than the national average and 36% lower than other states that, like Virginia, have joined Reggie. And third, going forward, we see typical residential rates increasing by a compound annual growth rate of around 2.1% through 2035, which is a comprehensive estimate and includes, among other factors, the impact of the de - carbonization investment programs, like our offshore wind project discussed today. If we move the starting point back to 2008, that rate of increase falls to 1.8%, which is lower than projected inflation for 2021. In summary, we continue to be on an unwavering path to meet Virginia's clean energy goals by 2045, and it's incumbent upon us to deliver energy that is safe, reliable, increasingly sustainable, and affordable. With that, let me summarize our remarks on Slide 17. Our safety performance year-to-date is tracking closely to our record-setting achievement from last year. We reported our 23rd consecutive quarterly result that normalized the weather meets or exceeds the midpoint of our guidance range. We narrowed the range of our 2021 earnings guidance and affirmed our existing long-term earnings and our dividend growth guidance. We're focused on executing our project construction and achieving regulatory outcomes that serve our customers well, and we're aggressively pursuing our vision to be the most sustainable regulated energy Company in America. Lastly, we look forward to seeing many of you next week in person at the EEI Financial Conference. With that, we're ready to take your questions.
Operator
Thank you sir. At this time, we'll open the floor for questions. [Operator Instructions] [Operator Instructions]. Thank you. Our first question will come from Shar Pourreza with Guggenheim Partners.
Jim Chapman
Morning sir.
Shar Pourreza
Bob or Jim, you got the settlement which as you mentioned in the prepared remarks, does de -risk even the second triennial review. I guess, I just want to touch a little bit on the level of confidence in your plan now. How does that tie-in to the 6.5% EPS growth target that's been out there? And could we see some changes around the capital program as a result of the settlement, maybe when you report year-end results?
Bob Blue
Yeah thanks, Shar. When we set that 6.5% rate in July of last year, July of 2020, we were confident then. We were asked some about it and we said that there's no obviously one input we were asked a lot about this triennial at the time. There's no one input to setting a growth rate like that. It's a variety of inputs and one of the things that we mentioned at the time was we assume that we're going to have constructive regulatory outcomes and we've had those. We had one in South Carolina, and in North Carolina, and in this Virginia triennial. All of that is supportive of that 6.5% growth rate, so we were confident at the time. We announced it. We remain confident; we think we've executed well on regulatory outcomes. And its most recent triennial settlement as a good example of that. As the capital we'll update, capital on the fourth quarter call as we mentioned in our prepared remarks. So the bottom line is, we remain as confident in 6.5% as we did when we announced it.
Shar Pourreza
Got it. And then just lastly on coastal wind, it's a huge day to dump so I appreciate that incremental color you provided. The $87 LCOE capital costs are higher, so obviously you're seeing some cost pressures despite being below the projections and still within the range, right. I think the initial cost correct me if I'm wrong, was $8 billion. Can you touch on the customer bill impact here as costs are higher just isolating this project and it seems that the input cost pressures are widespread. So how do you think about mitigating factors assuming these cost headwinds have some persistency?
Bob Blue
Yeah, so the costs? You're right, the capital costs number is, that we estimated earlier now that we've done all of the competitive bidding process and moved from conceptual to firm contracts, has gone up [Indiscernible]. But as we mentioned, the production expectation, that capacity factor out of this, has also gone up as we've got more data which means that the customer bill impact is the same. As we said, it'd be in an $80 to $90 per megawatt hour range, and we're squarely within that at $87. So, you can't focus just on the capital input here on a project like this. You also have to focus on how much electricity is it generating, since it's going to be generating more than we had previously assumed. That's what lands that customer impact, right where we've been talking about in the $80 to $90 range.
Shar Pourreza
Okay, great. Terrific. I think that sort of touches us on it. See you in a few days. Bye guys.
Bob Blue
Thanks Shar.
David Peters
Thank you. Our next question comes from David Peters with Wolfe Research. Hey, good morning, guys.
Jim Chapman
Morning, David.
David Peters
First question I have is just on the recent election outcomes in Virginia. Obviously a lot of focus there nationally and given that you now have a Republican Governor and I think the General Assembly flipped too, wondering if you could maybe just provide some perspective on what you think may or may not change going forward, particularly with respect to energy policy in the state?
Bob Blue
Yeah. Thanks, David. In the last, if you look back over the last 15 years or so in Virginia, I think that party, and power, and the Governor's mansion has changed twice. In the Virginia House of Delegates it's changed twice. In the State Senate it's changed several times. The Senate wasn't up for election this time, it was the governor and House of Delegates. What's remained consistent throughout that period is that our Company has maintained constructive relationships with members of both parties, and we don't see any reason that that would change, and the reason is that what has remained also consistent over that period and even before, is a bipartisan commitment to economic growth and jobs and the economy in Virginia. And if you look at what Governor-elect Youngkin ran on not surprisingly given his extensive business background, he ran on a platform of increasing jobs and economic growth, and we obviously support that. We're going to do everything we can to help him achieve the objectives of growing Virginia's economy. We do that by providing reliable electricity, by keeping energy prices affordable. We've done that over the years. That was our reliability and affordability were recognized by the FCC staff in the recent triennial review so we have a track record there. So what I would expect is that Virginia will continue that bipartisan commitment to jobs and economic development As witnessed in the announcement we talked about in our prepared remarks, the Siemens Gamesa offshore wind blade finishing factory, that was the result of bipartisan work. Both parties deserve credit for that kind of job creation in Tidewater Virginia. We would expect that that's going to continue going forward.
David Peters
Great. Second question is switching gears a little bit just on what's being proposed in Washington with this potential reconciliation bill. Wondering Jim, maybe if you could comment on how meaningful something like a direct day option would be for potentially loosening or lessening future equity needs given the many renewable projects that you guys have here at Omnicom.
Jim Chapman
Yeah Dave, it's a good question. A Lot of commentary on that topic so far this earnings season of both [Indiscernible] in some of that, and I agree with certainly one thing that's come up a lot that it's super hard to speculate on moving target pending and draft with legislation so hasn't landed yet. It's funny, a couple quarters ago on this call, we were all speculating as the impacts of the straight up corporate rate increase -- corporate tax rate increase so how things have changed. But a few thoughts, hard to say exactly what's going to be in the final version but it does seem to us that something is going to pass. So we'll see here next month or two, we imagine it will include the Clean Energy tax incentives and the direct pace future you're talking about. So that kind of thing, an extension of the tax credits under refundable basis, it's pretty clear that's going to be valuable and will benefit probably both our customers and shareholders. We expect incentives are going to reduce the cost of renewables to our customers, could accelerate everything we're doing in our Clean Energy transition, and probably provide some pretty nice cash flow features to fund additional capital investment, seems pretty good, details to come. Now in the same package there is the minimum tax. Not too disturbing for us who are already a cash tax payer. Not everybody is -- but that's going to be based on GAAP earnings. It doesn't start for 23 is the current proposal, so it's still early. How exactly that's going to work. There is a lot of detail to come but even that part we expect as part of this overall package, we think this is all pretty manageable within our existing financial profile and financial trajectory. So we'll get more clarity over time, maybe next quarter we can be talking about facts instead of speculation, but at all -- it's manageable as a package.
David Peters
Appreciate that detail. Thank you, guys.
Jim Chapman
Thank you.
Operator
Our next question comes from Paul Zimbardo with Bank of America.
Paul Zimbardo
Hi, good morning.
Jim Chapman
Morning Paul.
Bob Blue
Good morning, Paul.
Paul Zimbardo
[Indiscernible] method of update overall because I want to follow-up on Shar 's offshore then question. How should we think about the earnings potential and of the credit consideration from the $2 billion increase in the estimated cost?
Jim Chapman
Yeah, so let me talk to that. So, as we mentioned a couple of times here, we're going to provide a pretty comprehensive update on our fourth quarter call on all those details. We're going to do a 1-year roll-forward on our capital plan and we'll go through everything that's related to that in detail like we did last year -- early this year. The increase in the capital cost is one part of the LCOE; the increase in the capital costs on offshore wind. So a couple of things; keep in mind, that's spread over 6 years. So when you do a 1-year roll-forward, it's going to include that 2026 year, previous version only went through 25, So that will be included, but keep in mind that there are some other gives and takes, some other moving parts in our plan. For example, we announced in our IRP in September that we were undertaking a postponement for further evaluation of a couple of things, like some CTEs in Virginia and pump storage projects, so that's not in the current version of the near-term plan. A lot of gives and takes, some puts and takes. We're going to go through all that on the fourth quarter call, but for the avoidance of doubt, we expect all those updates are going to be supportive of EPS and dividend growth guidance. But you needed to look at it holistically and not just based on the impact of the offshore wind project alone.
Paul Zimbardo
Okay, that's clear, looking forward for that update. And then I know you commented on the pipe and prepare market but you could elaborate a little bit on the confidence in the transaction closing, given some of the uncertainties you mentioned and confirming the counter party could not proactively pay the termination to the exit and gigs?
Jim Chapman
Yeah, sure. And let me -- let me -- let me answer that a little bit higher level just for further one's benefit if they're not following, maybe as --- as closely. So we mentioned on the last call, very robust participation is auction. We ran and we feel very good about the announcement we made in October to sell that asset to Southwest Gas Holdings, all-cash transaction almost $2 billion and it is on track. We expect that to close this quarter subject only to HSR clearance. So yes, there is -- there's a lot of back and forth right in the press, we get that but we don't see any impact in our transaction. Our agreement is intentional, on both sides it's airtight. Surplus gas has fully committed financing, is not dependent on the completing equity issuance or anything like that. There are no conditions other than HSR and there is no provision where they could be terminated early. So we feel really good about that. Pretty straightforward, so we look forward to closing later this quarter.
Paul Zimbardo
Okay. Thank you. Very clear. Looking forward to EEI.
Bob Blue
Thanks, Paul.
Jim Chapman
Thank you.
Operator
Thank you. Our next question comes from Jeremy Tonet with JPMorgan.
Jeremy Tonet
Hi, good morning.
Bob Blue
Morning, Jeremy.
Jeremy Tonet
Just want to follow up with offshore wind a little bit more here, if I could. Just want to see, how do you see customer bill impacts through the completion of this initial offshore wind phase? And just thinking, what would be the bill impact under the 80 LCOE scenario? I think you might have touched on there with tax credits.
Bob Blue
Yeah. Obviously that would improve the customer bill impact associated with how the project is -- as you correctly identify, if there's a tax benefit that gets passed on to customers we're still sorting through that. But again, based on the inputs that we've defined here, we're just staying right in that 80 to $90 range. So we get the lower-end better for customers and obviously we will have to see how that plays out.
Jeremy Tonet
Got it. Thanks to that. And then just understanding there's a cross focus with the offshore wind here. Could you outline how the economic benefits in supplier agreements you outline have evolved since this project was first announced?
Bob Blue
Yeah, I think that they've evolved to be pretty consistent with what we expected when the project was first announced. So we had a pretty good idea of what will be involved in terms of construction and construction on onshore for the electric transmission, there may be some additional benefits probably with onshore electrical because that's going to be given what we had to do to route this and to make sure we're connecting to the 500 kV. That's part of what's driving the overall capital costs being greater. So a bigger investment there, more job creation there, but I think the bottom line is this is going to be good for the Hampton Roads economy, good for the Virginia economy. And I think that Siemens Games announcement is really important because it starts the process here in Virginia, a state that is very well-positioned given its location on the East Coast, given its port and the access to the port unobstructed by bridges and the deep water port to be a real hub of offshore wind economic activity. We certainly support that, and we supported that in working with Siemens Gamesa to put that blade factory here. So, the more, the better.
Jeremy Tonet
Got it. Maybe just one last quick one if I could? Could you speak a bit more to the R&D in hydrogen pilots, how they progressed over the past quarter?
Diane Leopoldo
Hi, good morning, Jeremy. This is Diane Leopoldo. I'll take that one. So, R&D at our program I think is far beyond up pilot now, and we're up and running. We have 1 project that's already in service. So, obviously, starting very small, but we have 5 projects that are under construction now, 2 of which should be entering service in the next couple of months and 4 more that are expected to be under construction by year-end. This is across both our swine and our dairy projects. All projects are doing well. On time, on budget, and we're expecting to keep up that rough pace next year. So that's on the R&D side. On hydrogen that certainly is at the pilot phase. Our Utah pilot, which was at a training facility in Salt Lake City, is just about complete. And the test focused on residential end-use appliances, leak survey equipment, nitrous oxide emissions. The results of those tests confirm that 5% hydrogen blend would not adversely affect the distribution system. All appliance are operated safely there weren't a lot of changes to [Indiscernible]. So we're still doing -- it increased hydrogen blend up to -- from that testing but -- our next steps, several isolated and started the initial design planned test. And we'll be meeting with them over the coming months so that we can launch an expanded pilot probably in early 2023. And then -- project in North Carolina subject to commission.
Jeremy Tonet
Got it.That's very helpful on high vision project side.Thank you so much.
Operator
Thank you. This does conclude this morning [Indiscernible] this conference call. You may now disconnect your lines and enjoy your day.